ARB High Performance On-Board Compressor

ARB SKU: CKMA12

$338.00

Shipping calculated at checkout

Available Now!

The most popular in our range, the ARB High Output Air Compressor has been constructed entirely of lightweight, high-grade materials and is available in both portable and vehicle mounted configurations. With a class-leading flow rate, this compressor has been designed for Air Locker® activation (on-board model), fast tire inflation and a range of other functions whether they be for work or play. The vehicle mounted kit comes with a full wiring loom and mounting hardware for easy installation, while the portable kit includes a 6 meter air hose, battery clamps, inflation kit, and a durable carry case.

ADDITIONAL FEATURES

  • Sealed for moisture and dust resistance
  • Hard-anodized cylinder bore for reduced friction
  • Teflon-impregnated carbon fiber piston seal for maximum trouble-free life
  • Anodized mounting bracket dissipates motor heat and allows compressor to be repositioned 180 degrees on vehicle mounted models
  • Quality components for quiet operation and extra long life
  • Constructed entirely of lightweight, high strength engineering grade materials
  • Over-pressure safety valve equipped
  • Motor is internally thermal protected against extreme temperature damage
  • Heavy duty maxi-fuse equipped for professional in-line circuit protection
  • On-board model available in either a 12V or 24V configuration

 

Current Lead Times

CBI Offroad Fab Current Lead Times

BUMPERS
Steel Front Bumpers | 6 Weeks
Aluminum Front Bumpers | 4 Weeks
Rear Bumpers | 8 Weeks
Covert Bumpers | 4 Weeks

RACKS & BARS
Bed Racks | 4 Weeks
Bed Bars | 1 Week
Prinsu Roof Racks | 1 Week

ROCK SLIDERS
Rock Sliders | 4 Weeks

SKID PLATES
Skid Plates | 4 Weeks

ACCESSORIES
Ditch Light Brackets | 1-2 Week
CBI Accessories | 1-2 Week
Prinsu Accessories | 1-2 Week

All Lead Times Are Estimations

All lead times are estimates and rely on various factors. We are currently experiencing higher-than-usual lead times as many companies are within our industry. 

 

We are actively improving our processes, increasing teams, and growing our resources to decrease these times as quickly as we can. 

 

If you have questions about your lead times, please check the estimated lead time and compare it to your order date. If you have additional questions, please reach out to our team. Thank you again for your continued support and patience. 

THIRD PARTY PRODUCTS

Any potential delay that occurs in the sourcing, processing, or drop shipment at the third party level will be communicated to the best of our ability to the customer.