FACTOR 55 STANDARD DUTY SOFT SHACKLE 1/2" X 10"

Factor 55 SKU: 00585

$88.00 $110.00 Save $22

Shipping calculated at checkout

Only 5 left!

Soft shackles may be used as a lightweight replacement connecting rigging for common steel screw pin shackles. The Factor 55 10 inch (pull to pull length) Standard Duty Soft Shackles are Made in the USA under the uncompromised Factor 55 quality standards. Like all Factor 55 rigging products, these shackles have been lab and field-tested to assure consistent repeatable minimum breaking strength values. Each Standard Duty soft shackle is constructed of 1/2″ diameter UHMWPE 12 strand rope similar in construction to synthetic winch lines.  WLL and minimum breaking strengths clearly marked.

This product is compatible with Closed System Winching®, a technique that uses rigging comprised entirely of closed-link hardware. With Closed System Winching you get the extra security and confidence needed to tackle the most demanding winch recoveries. 

  • Minimum Breaking Strength – 60,000 pounds
  • WLL – 12,000 Pounds. Weight – 7 ounces.
  • Each individual soft shackle is serialized for manufacturing date and material lot traceability.
  • NOTE- Easily fits standard shackle mount products.
  • Engineered, Tested, and Made In The USA
  • Check out the Factor 55 Truck/SUV Catalog

 

Current Lead Times

CBI Offroad Fab Current Lead Times

BUMPERS
Steel Front Bumpers | 6 Weeks
Aluminum Front Bumpers | 4 Weeks
Rear Bumpers | 8 Weeks
Covert Bumpers | 4 Weeks

RACKS & BARS
Bed Racks | 4 Weeks
Bed Bars | 1 Week
Prinsu Roof Racks | 1 Week

ROCK SLIDERS
Rock Sliders | 4 Weeks

SKID PLATES
Skid Plates | 4 Weeks

ACCESSORIES
Ditch Light Brackets | 1-2 Week
CBI Accessories | 1-2 Week
Prinsu Accessories | 1-2 Week

All Lead Times Are Estimations

All lead times are estimates and rely on various factors. We are currently experiencing higher-than-usual lead times as many companies are within our industry. 

 

We are actively improving our processes, increasing teams, and growing our resources to decrease these times as quickly as we can. 

 

If you have questions about your lead times, please check the estimated lead time and compare it to your order date. If you have additional questions, please reach out to our team. Thank you again for your continued support and patience. 

THIRD PARTY PRODUCTS

Any potential delay that occurs in the sourcing, processing, or drop shipment at the third party level will be communicated to the best of our ability to the customer.